|
| 2011 WASTEWATER RATE SCHEDULE |
Effective date July 1, 2011
|
|
| |
|
|
| First |
2,000 gallons |
minimum bill $20.00 |
| All Over |
2,000 gallons |
$5.93/thousand gallons |
| |
|
|
| METER SIZE |
MINIMUM BILL |
USAGE UP TO MINMUM |
| ¾ inch |
$20.00 |
2,000 gallons |
| 1 inch |
$34.83 |
4,500 gallons |
| 1 ½ inch |
$162.32 |
26,000 gallons |
| 2 inch |
$269.06 |
44,000 gallons |
| 3 inch |
$417.31 |
69,000 gallons |
| 4 inch |
$701.95 |
117,000 gallons |
| 6 inch |
$1,300.88 |
218,000 gallons |
| 8 inch |
$1,899.81 |
319,000 gallons |
| 10 inch |
$2,498.74 |
420,000 gallons |
| 12 inch |
$3,097.67 |
521,000 gallons |
| |
|
|
| |
| |
REGULAR TAP $900.00
PLUS BORE COST IF APPLICABLE ON ALL TAPS
SEWER TAPS WILL BE AT SAME COST OF WATER METER |
| |
|
|
TRDA Fee- $1500.00
if applicable in addition to tap fee.
Construction cost of Pump Systems - All
construction cost of grinder pumps, step system
or other types of on-site system is to be paid
by individuals or POA. TASS will furnish
standard specifications and will inspect construction
prior to making sewer service. |
| |
|
|
| |
| |
|
|
|
|
|
|